July 30, 2008

Singapore Visiting Workshop

aa_sng_11.jpg

Larry presenting the growth of their building

Singapore Visiting Workshop

aa_sng_10.jpg

Ivan explaining his group’s proposal for the extension of the UOB complex

Singapore Visiting Workshop

aa_sng_9.jpg

Models

Singapore Visiting Workshop

aa_sng_7.jpg

The public “garden” on the 26th floor

Singapore Visiting Workshop

aa_sng_6.jpg

Up to the 26th floor

Singapore Visiting Workshop

aa_sng_5.jpg

Peng Beng giving a site tour of the pinnacle@Duxton currently under construction to
the workshop

July 25, 2008

Crossings at SPANS exhibition

val-picture-1.jpg
Last nights SPANS exhibition opening at the Building Centre featuring the CROSSINGS project part of a group show about Viaducts, Bridges and Walkways. The show runs from 24 July – 20 September

Crossings at SPANS exhibition

val-picture-2.jpg
Site model 1:50 – concept and design by Claude Ballini

Crossings at SPANS exhibition

val-picture-4.jpg
Yuko and Naoki

Crossings at SPANS exhibition

val-picture-5.jpg
Crossings is the smallest bridge with the shortest span 19m – project Nr. 1

Crossings at SPANS exhibition

val-picture-6.jpg
Detail of STL model made out of ZP131 and Cyber bond 5005.

Crossing at SPANS exhibition

val-picture-7.jpg
Under belly of the model – 5mm steel rode holding 4mm of landscape tiles.

July 24, 2008

Maeda Workshop

finished.jpg

Installation completed.

Maeda Workshop

shin.jpg

The Japanese electrician making some final adjustments.

Maeda Workshop @ AA Dining Room

team.jpg

Photo time.

Maeda Workshop

maedathurs1.jpg

Installation day 3.

July 23, 2008

Maeda Workshop

pieceswaiting.jpg

Pieces sealed and waiting.

Summer School Unit 3

sumsc3.jpg

The ‘Urban Scientists’.

Summer School Unit 3

sumschunit3.jpg

Making blank canvas jump suits.

They will go out and add to them according to the reactions they get.

Projects Review

photo2.jpg

.